August 17–22
  • Remove the remainder of the effected subgrade in Phase 1
  • Place 10” of material to correct the failing subgrade
August 24-29
  • Place 10” of Hot-Mix Asphalt in Phase 1
  • Pour the remainder of the concrete paving in Phase 1